Firefighter nozzle

For Turnhill, a first version of samples serving as nozzles used in firefighting (using 316L as material) has been produced. More details can be found in this Report for firefighter nozzle. If printing 200 parts (multiple variants possible), it is estimated that 3D-printing time is 5 days and 13 hours and post processing 30 min/piece […]

Gas mixer – part consolidation

his demonstrator part (reduced assembly) was especially designed for 3D-printing and only has 2.2% support material, requiring 30 minutes of post processing per part (5 minutes to unfasten from platform, 20 min machining and 5 min blasting). One batch printing is 11 h at 880€, while a four batch printing takes 29 h at a […]

Robot gripper

Robot gripper body part and developped version.

Formula student

Formula Student is a student engineering competition held annually in the UK. Student teams from around the world design, build, test, and race a small-scale formula style racing car. The cars are judged on a number of criteria as listed below. It is run by the Institution of Mechanical Engineers and uses the same rules […]

Upper tool set

Upper tool set for bending tests using tensile test machine.

Mini platform of Titanium

Mini platform of Titanium bending fatigue test bars.